Project name:PESHKABIR GAS PROJECT
Delivery date:15th July 2019
Product:Flange----2580 pcs
                 Steel Pipe------28800 meters 
                 Pipe Fitting-----1524 pcs
Description:
DNO Iraq AS operates the oil fields Peshkabir and Tawke as well as the Fishkhabour oil terminal in the northern Kurdistan region of Iraq. New gas pipelines are required to transport associated gas from Peshkabir to Fishkhabour and from Tawke central processing station to injection points in the oil field.
Project name:Water Injection Project, Khurmala Field
Delivery date:28th Dec.2019
Product: Steel Pipe ---------18400 meters
                      Flange-------------1325 pcs
 
Description:
The objective of this project is FEED design of River Water Intake Facilities, River Water Treatment, River Water
Transfer Pipeline, River Water Storage, Tie-ins for treated produced water from CPS-1 and CPS-2, Water
Booster Pumps for CPS-1, Water Injection Pumps, injection Manifold and associated utilities.
Project name:UMM AL DALKH EARLY PRODUCTION COMBINED CONCEPT AND FEED PROJECT
Delivery date:20th May 2020
Producy: Steel Pipe --------6800 meters
                  Flange -------------3250 pcs
                 Pipe Fitting ---------2230 pcs
 
Description:
The project involves supply of treated Sea water from CPC to WHP-15 through a new 
subsea pipeline. Treated Sea water will be injected in to 2 new and 2 existing water injection
wells at WHP-15.